The Foundation, Part 3

Finished most of the floor envelope (adding the last layer underneath will have to wait until the plumbing, electrical and framing bolting are complete) and started the wall framing.

1. Completed lower insulation (This will add an additional 7.5R value to the floor, bringing the subtotal R value to R28 ; the additional 3 Inch layer added later will bring the total to R38)

Preptrailer.10

2. Installed 3/4 inch plywood (birch on one side), drilled bolt holes through to steel frame (for tension ties to wall framing) and rubbed in water based varnish.*

Subfloor.5

3. Prepped, flashed deck area and pieces.

Deck.1

* Note: All 2×4’s, 2×6’s and 2×8’s are SFI Certified Wood.